Building Shells Complete, Interior Work Begins! PDF Print E-mail

Marking out interior wallsNow that the shells of the buildings are complete and a contractor for the interior work has been secured, the division of the shell into classrooms and workshops has begun. Concrete block construction is typical of this part of the world since wood is neither plentiful nor affordable. Masons have begun to divide the interior space building block walls which will not only add additional sound-proofing, but aid in climate control as well. Since the walls will be made of concrete with a stucco and painted finish, the masons must be careful to allow for inclusion of the other disciplines that will need to be incorporated into the walls according to the architectural plans; electrical lines, water lines, and drainage.  This work will take several months to complete.

Volunteer opportunity: Help will be needed to assist with the landscaping of the multi-level outdoor sitting areas and grounds. Those interested in volunteering, either as an individual or as a work team, please contact the US Coordinator.

 
< Prev   Next >
All Rights Reserved for Bright Stars of Bethlehem, (c)2007-2009. Designed by Basim Najjar.
All Rights Reserved for Bright Stars of Bethlehem, (c)2007-2009. Designed by Basim Najjar.